A Cellar Bulkhead Door Is a Staging Path, So Mark It Before Roof Day

A cellar bulkhead can carry crew traffic, debris and water during a roof job, so name the door in the bid before the first truck arrives.

Gutter is the least glamorous part of a roofing job and it causes more expensive damage than any other part of it, because water that misses the gutter does not go away. It goes to the foundation, and foundation water on a large old house is a five figure conversation with a different trade entirely.

A cellar bulkhead is the sloped door at grade that opens onto the basement stair, and on many older houses it is the only way into the lower level that does not run through the kitchen or the garage. On roof day it can turn into a shortcut for the crew, a chute for debris, or a stretch of old frame that was never built to take a dumpster edge. The door does not appear on most roof bids, which is the reason to name it on paper before the first truck arrives.

Town roofing

Ladue lots often carry grade changes, and the lower side of the house may be reached only from a side yard or the back of the lot. Many older houses have a bulkhead set into a short masonry wall, with a wood or steel door that lifts up on hinges at its top edge. The walls take freeze and thaw every winter in the St. Louis area, and the cracks that open at the corners and the seal at the top edge are the first things to show their age. A roofer who leans a ladder, a bundle of shingles or a sheet of plywood against that wall can widen a crack that was already there, so the condition of the frame should be recorded before anyone touches it.

Roof day also tends to put weight and traffic in places nobody planned for. A dumpster set beside the bulkhead can press its edge on the sloped door or the frame. A crew carrying bundles down a narrow basement stair can scrape the treads and bump the handrail. Landscape edging, a mulch bed or a row of planters often sits in the path between the driveway and the door, and that path is the one the crew will use to reach it. None of this is unusual, and none of it needs to become a dispute if the plan names the door before the work starts.

Water is the other concern. A bulkhead sits in a low spot by design, since its job is to let the stair come up out of the ground. When tear-off grit and rain run off the roof, they travel downhill, and the door is often downhill from a downspout, a gutter that has been opened up for the work, or a patch of bare soil. If the basement stair is wet after a storm during the job, the homeowner may not be able to tell whether the water came through the door, through the wall, or through the drain. A written record of the door before and after the work answers that question faster than memory does.

Timing matters too. A roof that opens in late summer may stay open through the first cold rain of fall, and a bulkhead seal that is already stiff will let air and wet in before the new shingles are on. Ask the crew how they plan to cover the door if the job runs past a forecast front, and whether the cover goes on at the end of each day or only when rain is predicted.

What it costs

A bulkhead door is seldom its own line in a roof bid, and that is why it gets missed. The cost sits in a few places that are easy to overlook. There is the time to mark, protect and cover the door and its frame before tear-off, and the time to clean the sill, the stair treads and the landing after the last nail. If the crew uses the bulkhead as a debris path, that is a separate method with its own labor, its own sweep and its own question about who checks the stair afterward. If a cracked wall, a rotted frame or a sagging door turns up during the work, the repair is a different trade with a different price, and it should appear in writing as a unit price before the crew starts it, not as a surprise added to the final bill.

Ask for these items to be priced on their own lines rather than buried in a general protection allowance. A line that says protect site tells you nothing about the door. A line that says cover bulkhead door and frame with plywood and plastic, remove the cover on the final day, and sweep the stair tells you exactly what you are paying for. The same logic applies to dumpster placement. If the bin has to sit away from the bulkhead because the drive is narrow or the lawn is soft, the bid should say whether the extra carry distance for the crew is included, and whether a second move is needed to get the bin out.

Do not expect a single number from this page. The cost depends on the door's size and material, how far the stair is affected, whether the crew plans to use the door at all, and how far the roofer must carry materials from the truck. The useful step is to get each of those conditions written into the scope, then compare the bids against the same conditions. Two bids that look far apart may simply describe different doors, different paths and different cleanup, and seeing that difference is the point of reading them side by side.

What to ask

Bring these questions to each roofer before you sign. A good answer names the door, the path and the date.

  • Will the crew use the bulkhead for any part of the tear-off, such as sending debris down a chute, carrying bundles down the stair, or moving tools in and out?
  • Where will the dumpster sit relative to the bulkhead, and how close will the bin edge or the wheels come to the door and its frame?
  • Who inspects the door, the hinges, the frame and the seal before the first day, and will that inspection be photographed and sent to me in writing?
  • How will the door be covered and protected, and who takes the cover off on the last day?
  • What is done about tear-off grit on the sill, the stair treads and the basement landing, and when is it swept?
  • If the basement is wet after a rain during the job, how will the crew document the door, the wall and the stair before anyone blames the roof?
  • If the frame or the wall is damaged during the work, is that repair included in this bid, or is it a separate written change with a unit price?
  • Does the crew walk the bulkhead with you at the final walk-through, and is it photographed with the rest of the property?

If you want these answers before you choose, call the Keys office at (314) 220-2333 and ask the same questions in the same order. Keys documents the existing condition and puts the written scope, with photos and measurements, in your hands before the work begins.

Ask about your roof

If it overflows in the same spot every time

A gutter that fails in one predictable place is usually telling you it needs an outlet, not a replacement.

Seamless gutter formed on site, guards, downspouts, extensions and underground carry.