A balcony hung on the wall above an entry roof decides where the crew stands, what the flashing needs and which costs belong in the bid.

Gutter is the least glamorous part of a roofing job and it causes more expensive damage than any other part of it, because water that misses the gutter does not go away. It goes to the foundation, and foundation water on a large old house is a five figure conversation with a different trade entirely.

A second-floor balcony over an entry roof in Ladue is often two jobs that look like one. The roof gets new shingles, and the balcony above it gets read as a deck, a railing and a door threshold. But the balcony usually hangs off the house wall, and the place where its frame meets that wall sits right above the lower roof you are replacing. If the bid treats the balcony as something to work around, the ledger flashing can be left as it was, and that is the spot where water tends to get in.

Town roofing

Many Ladue houses have generous rooflines, and many of them have an entry or porch roof that ties into a wall beneath a second-floor door. Where that door opens onto a balcony, the wall carries the balcony load through a ledger, a band of framing or a set of posts. The roof plane below meets the wall at the ledger line. Three things happen there at once: the deck framing holds the wall, the flashing sends water away from the wall, and the shingles lap the flashing so the water runs down the roof rather than behind it. A crew replacing the shingles on that plane has to disturb all three.

St. Louis winters make this worse. The freeze and thaw cycle pushes water into any gap where a ledger meets siding or brick, and it does so especially in February and March, when the deck boards are wet and the sun is low. A balcony that drains well in July can still hold snowmelt along its back edge in January. If the entry roof was installed without continuous flashing behind the ledger, that moisture has been finding its way in for years, and it is usually found only when the shingles come off.

Check the ledger before the shingles come off

Before any tear-off, the balcony's connection to the wall should be looked at by someone who knows what to look for. The point is not to judge the balcony. It is to learn what the roof crew will be working around. The useful questions are these. Is the ledger bolted through the siding and sheathing into the rim or the wall framing? Is there flashing above the ledger that lets water run out past the deck boards? Does the siding under the balcony show staining, soft spots or rot at the top of the wall? Does the balcony have its own drainage, such as a scupper, a gutter or a deck sloped to send water off the front?

If the answers are unclear, the simplest fact to get is a photo. Keys Roofing documents the wall at every point where the entry roof meets it, including the ledger line, the step flashing and the lower edge of the balcony framing. Those photos go into the written scope so the homeowner has them before the crew starts. A photo taken from the ground does not show the flashing, so the photo should be taken from a ladder set at a safe angle, or from the balcony itself with the balcony door in view.

Where the entry roof meets the wall

The lower roof usually ends against the wall with step flashing woven into each course of shingles, or with a continuous metal counterflashing set into a reglet. Under a balcony, the step flashing can be tucked behind the deck framing, which means the crew cannot see the top of it without loosening the balcony boards. A roof quote that says "replace flashing at wall" without saying how far under the balcony that work reaches leaves open the question of whether the balcony boards come up.

Ask which of three approaches the bid assumes. One, the crew works from the roof surface and never lifts a deck board. That is quick, but it may leave the ledger flashing unchanged. Two, the crew lifts the nearest deck boards to reach the top of the flashing and reinstalls them, which should be written as a line item with the boards named. Three, a deck carpenter lifts and resets the balcony, which is a separate trade and should appear as a separate contract line, not as a note inside the roof price. Each approach has a different cost and a different risk of damage to the deck finish. None of them is a reason to skip the flashing.

Metal is common at this junction. Where the counterflashing is aluminum, the metal should be named in the scope along with its gauge, and the reglet depth should be stated. Where the balcony has a painted wood rail, the paint should be checked before the crew raises a ladder against it. A ladder set against a balcony rail can bend the rail or chip the paint at the top rail, and that damage then needs its own repaint.

Tear-off around a balcony

Tear-off on a balcony roof means shingle debris falls past the balcony edge and onto the deck, the rail and the planting beds below. Nails and granules collect in the gaps between deck boards and can make a patio or lawn look worse than it is. The bid should say how the crew protects the balcony surface. Plywood or a tarp over the deck, a magnet sweep at the end of each day and a plan for dumpster placement under the balcony are all reasonable, and each one should be written down so the homeowner knows what to expect when the crew leaves.

Furniture on the balcony needs moving before the crew starts. So do potted plants, outdoor lights mounted to the railing and any cushions left on the deck. If the balcony door opens onto the work zone, the bid should say whether the crew will keep it closed, whether the homeowner should avoid using it on tear-off days, and who is responsible for a door left open while the crew is on the roof.

Noise and dust travel up as well as down. A balcony above a tear-off puts the homeowner close to the work, and a crew working above the balcony may shake loose any hanging items on the wall. The homeowner should decide before the start date which rooms face the work, and whether the bedroom behind the balcony door is a room they want open during the job.

What it costs

The price of the entry roof does not automatically include the balcony. A roof bid that covers the shingles and the flashing at the wall is one number. A deck carpenter lifting boards, resetting them, replacing damaged framing or resealing the ledger is a second number, and a railing repair or repaint is a third. Each of these should appear on its own line in the written scope. When a bid lumps them together as "balcony flashing" or "allowance for deck," the homeowner has no way to compare it with another quote.

Allowance lines are common when the ledger condition is not known until the boards are up. An allowance is a sum set aside for work that may be needed, and it should come with unit prices, such as a per-foot price for replacing ledger flashing or a per-board price for resetting deck boards. Without unit prices, an allowance can grow in the middle of the job with no clear basis for the change.

What to ask

  • Does the bid include lifting and resetting any balcony deck boards, and if so, which boards and how many?
  • Is the ledger flashing replaced, reused or inspected only, and does the scope name the metal and its gauge?
  • Who inspects the wall behind the ledger before the shingles are set, and will you receive photos of that inspection?
  • Is a deck carpenter part of your crew, or is that a separate trade with a separate price?
  • How is the balcony surface protected from nails and granules, and who sweeps it each evening?
  • What happens to the railing paint if the ladder touches it, and who repaints it?
  • Where will the dumpster sit relative to the balcony, and does the bid include moving it?
  • If the ledger shows rot or water damage once the boards are up, what does the bid say about stopping work and pricing the repair?

Ask for the written scope in advance and read it against the list above. A balcony changes the roof plan, and the roof plan is where the homeowner will feel any gap in the scope. Keys Roofing can walk the balcony and the entry roof with you before any price is set, and the office at (314) 220-2333 can arrange that visit.

Ask about your roof

If it overflows in the same spot every time

A gutter that fails in one predictable place is usually telling you it needs an outlet, not a replacement.

Seamless gutter formed on site, guards, downspouts, extensions and underground carry.

(314) 220-2333

Straight through to the office