Roofing in LadueKeys Roofing

Roofing, gutters, downspouts

(314) 220-2333

Roofing in Ladue › Gutters on a large house

Article 07 · Gutters

A Backyard Putting Green Takes the Staging Space Your Crew Needs

A putting green can look like open lawn from the kitchen window, so settle the ladder path, bundle drop and cleanup in writing before roof day.

Gutter is the least glamorous part of a roofing job and it causes more expensive damage than any other part of it, because water that misses the gutter does not go away. It goes to the foundation, and foundation water on a large old house is a five figure conversation with a different trade entirely.

A putting green is one of the few backyard features in Ladue that looks like an open lawn from the kitchen window and works like a staging yard from the driveway. It is flat, it is open to the house, and it sits on the side of the house where the crew's walk would normally run. Before the tear-off starts, that makes the green the first thing a roof crew will want to use and the last thing a homeowner thinks to mark. Settle it before the trucks arrive, not on the morning of the job.

Town roofing: why the green gets picked

Ladue lots are generally deep and wide, and the houses sit back from the street behind long drives and mature plantings. The roof truck parks on the street or in a turnaround, and everything else has to travel by hand or by cart from there to the back of the house. Shingle bundles, tear-off bags, the ladder and the trailer's staging all need a clean run across the yard. A green offers a flat, open run with no beds or steps in the way, so a crew lead looking at the lot will often point to it without asking what it is.

The problem is what the green is made of. Putting greens are built in layers, usually a sand-based root zone over a drainage bed, and the turf is mowed to a height measured in fractions of an inch. A single pallet of shingles weighs thousands of pounds and sits on a few small feet. A ladder leg dropped on the surface can push through the cut turf into the sand. A loaded wheelbarrow can leave ruts that show until the green is rolled again. None of this is a reason to refuse the crew. It is a reason to name the route in writing before the first load.

What St. Louis weather does to a green in the roof window

Roof work in this metro usually falls between late spring and early fall, or in a few dry weeks in autumn, and each of those windows carries its own risk for turf. In a wet spell the sand root zone holds water and compacts under load. Through the late autumn freeze thaw cycle, the top layer of soil can heave and then settle, and turf that has been walked on while frozen can crack along the footprints. The damage can show up in spring as thin lines across the green that were not there before the roof.

Ask what the forecast looks like for the days the crew will be on the lot, and whether the roofer will move the staging path to a gravel or board surface if the green is soft that morning. A roofer who says the crew will work around the green and not on it has answered the question. Ask for that answer to be written on the job's site plan.

Settle the green before roof day

Work through these before the crew arrives, and send the answers to the office in writing so the roofer's job lead has the same sketch you do.

  1. Draw the green on a copy of your lot plan and mark the strip you will allow for the ladder and the bundle drop, with the edge of the green marked as a no-step line.
  2. Decide what sits under the ladder feet. Plywood or boards laid on the turf spread the load, and the crew should bring them, not borrow them from you.
  3. Mark every sprinkler head, drain outlet and sand inlet on the green, so no one steps on a head or drives a stake into a pipe.
  4. Pick the bundle drop point. A dry, firm patch next to a drive or a gravel bed is better than the center of the green, and it keeps the pallet off the sand.
  5. Name the cleanup. Tear-off leaves nails, granules and small debris in turf, and a magnet sweep plus a rake pass should be on the bid, not left to the homeowner.

Each line answers a question you would otherwise discover on the morning the pallet arrives. A homeowner who has a sketch and a board plan rarely has to make a decision at the foot of the ladder.

What it costs

The green rarely changes the price of the shingles or the tear-off labor itself. It changes the lines around the job: extra carry time when the crew walks bundles farther than a driveway route would require, boards or mats laid to protect the surface, a second sweep for nails and granules, and in some cases the time to re-roll or re-seed a worn strip after the job. Those lines should appear as their own items on the written bid, with a description of what each one covers. If a bid lumps them into a general mobilization or a single site charge with no explanation, ask for the breakdown before you compare totals.

Keys Roofing can talk through the lot plan and the staging path by phone at (314) 220-2333, and the crew can walk the green with you before the date is set. Ask for that walk to be written up with photos and measurements, so the record of the lawn's condition before the job is in your hands.

What to ask each roofer

  • Where will the ladder feet land, and what will they stand on?
  • Which route will the bundles take from the pallet to the roof, and who carries them?
  • Is the green listed on the bid as a staging surface, or as off limits?
  • Who marks the sprinkler heads and drain outlets before the first load?
  • What happens if the green is soft on the morning of the job?
  • Who sweeps the green after tear-off, with what tool, and how many passes?
  • Does the written scope show the carry and protection lines as separate items?

Write the answers down. A roofer who can answer each of these in the same terms, and who puts the answers on the sketch, has shown you how the crew will work on your lot. A roofer who says the green will be fine is saying something you cannot check.

Ask about your roof

If it overflows in the same spot every time

A gutter that fails in one predictable place is usually telling you it needs an outlet, not a replacement.

Seamless gutter formed on site, guards, downspouts, extensions and underground carry.

(314) 220-2333

Straight through to the office